Select Page

D1

Find out where and when work is being done in Murry Hills, ROLO, Royal Poinciana and Whispering Pines.

D1 Schedule

D2

Find out where and when work is being done in Sunset Ridge, Tropical Ridge and Vernon Heights.

D2 Schedule

D3

Find out where and when work is being done in College Park, Eden Place, Mango Groves and Parrot Cove.

D3 Schedule

D4

Find out where and when work is being done in Bryant Park, Downtown Jewel, Pineapple Beach, SOSA and South Palm Park.

D4 Schedule

Definitions & Types of Repairs

Full Reconstruction:

Repair sewerage, water, and drainage lines, rebuild the street entirely, and repair sidewalks and curbs.

Future Road Work Pending:

Work may occur in the future, as more funding becomes available.

Incidental Road Repairs:

Remove damaged portions of the asphalt roadway and replace it with new smooth pavement.

Streetscape

Landscaping and other aesthetic improvements such as neighborhood signage and lighting.

Non-Paving Incidentals

Repair damaged sidewalks, driveway aprons and curbs within the public right-of-way.

Patch Concrete

Remove damaged portions of the concrete roadway and replace it with new smooth concrete pavement.

Patch Mill / Overlay

Repave the asphalt roadway from curb to curb and repair damaged sidewalks.